Type: Audio Visual Recording
Title: Lowood Swimming Pool Condition Assessment and Upgrade Strategies Sheila Olandria
Authors: Olandria, Sheila
Tags: Lowood Pool Upgrade;Infrastructure Maintenance
Issue Date: 2020
Publisher: Institute of Public Works Engineering Australasia Queensland
Abstract: In May 2019, GHD was engaged by Somerset Regional Council to assist in the decision making process for either refurbishment, replacement or full site development as per the Fulton Trotter Master Plan Review in April 2019 of the Lowood Pool. GHD completed the site investigation – geotechnical, core sampling and testing and visual assessment to assess the current conditions, determine remaining life of the asset and identify opportunities for asset life extension or asset replacement. An upgrade strategy with comparative cost based around refurbishment of the pool or partial site redevelopment were also included as the delivery for the project.
URI: https://webcast.gigtv.com.au/Mediasite/Showcase/ipwea-swq-branch-conf-2020/Presentation/b830fc0b07064738a520e9f2c8c8fa801d
Appears in Collections:SWQ Branch Conference, Stanthorpe 2020 (PRESENTATIONS)

Files in This Item:
File Description SizeFormat  
Sheila Olandria.JPGSheila Olandria61.24 kBJPEGThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.