Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/5926

Full metadata record
DC FieldValueLanguage
dc.contributor.authorOlandria, Sheila-
dc.date.accessioned2020-03-05T20:15:08Z-
dc.date.available2020-03-05T20:15:08Z-
dc.date.copyright2020en_US
dc.date.issued2020-
dc.identifier.urihttps://webcast.gigtv.com.au/Mediasite/Showcase/ipwea-swq-branch-conf-2020/Presentation/b830fc0b07064738a520e9f2c8c8fa801d-
dc.description.abstractIn May 2019, GHD was engaged by Somerset Regional Council to assist in the decision making process for either refurbishment, replacement or full site development as per the Fulton Trotter Master Plan Review in April 2019 of the Lowood Pool. GHD completed the site investigation – geotechnical, core sampling and testing and visual assessment to assess the current conditions, determine remaining life of the asset and identify opportunities for asset life extension or asset replacement. An upgrade strategy with comparative cost based around refurbishment of the pool or partial site redevelopment were also included as the delivery for the project.en_US
dc.publisherInstitute of Public Works Engineering Australasia Queenslanden_US
dc.subjectLowood Pool Upgradeen_US
dc.subjectInfrastructure Maintenanceen_US
dc.titleLowood Swimming Pool Condition Assessment and Upgrade Strategies Sheila Olandriaen_US
dc.typeAudio Visual Recordingen_US
Appears in Collections:SWQ Branch Conference, Stanthorpe 2020 (PRESENTATIONS)

Files in This Item:
File Description SizeFormat  
Sheila Olandria.JPGSheila Olandria61.24 kBJPEGThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.