Please use this identifier to cite or link to this item:
https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3404
Type: | Project Sheet |
Title: | Rehabilitation and Partial Up-size of Existing Concrete culverts Under the M1 Motorway, Wollongong, NSW |
Authors: | ITS Pipetech |
Tags: | Road Infrastructure |
Issue Date: | 2017 |
Copyright year: | 2017 |
Publisher: | ITS Pipetech |
Abstract: | Combining traditional tunnel ling technology with modern day rehabilitation techniques enabled ITS Pipetech to submit and subsequently provide a solution to RMS [Roads & Maritime Services] to extend the life of an existing set of culverts that crossed the M 1/Princes Highway outside The University of Wollongong. The prime objective of the work was to provide structural integrity and equalise the bores of a triple cell culvert that passed beneath one of the busiest arterial routes in Australia and to achieve a design life of 100 years. The secondary consideration was to devise a methodology and a seq ue nee of works that caused the least disruption to the motorway that carries over 18,000 vehicle movements a day just 2 m above the top of the culverts. |
Description: | Project Sheet |
URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3404 |
Appears in Collections: | Company Project Sheets and Corporate Brochures |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Tunneline - Mt Ousley.pdf | 668.77 kB | Adobe PDF | ![]() View/Open | |
Pages from Tunneline - Mt Ousley.jpg | jpeg | 169.25 kB | JPEG | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.