Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3404

Type: Project Sheet
Title: Rehabilitation and Partial Up-size of Existing Concrete culverts Under the M1 Motorway, Wollongong, NSW
Authors: ITS Pipetech
Tags: Road Infrastructure
Issue Date: 2017
Publisher: ITS Pipetech
Abstract: Combining traditional tunnel ling technology with modern day rehabilitation techniques enabled ITS Pipetech to submit and subsequently provide a solution to RMS [Roads & Maritime Services] to extend the life of an existing set of culverts that crossed the M 1/Princes Highway outside The University of Wollongong. The prime objective of the work was to provide structural integrity and equalise the bores of a triple cell culvert that passed beneath one of the busiest arterial routes in Australia and to achieve a design life of 100 years. The secondary consideration was to devise a methodology and a seq ue nee of works that caused the least disruption to the motorway that carries over 18,000 vehicle movements a day just 2 m above the top of the culverts.
Description: Project Sheet
URI: http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3404
Appears in Collections:Company Project Sheets and Corporate Brochures

Files in This Item:
File Description SizeFormat  
Tunneline - Mt Ousley.pdfpdf668.77 kBAdobe PDFThumbnail
View/Open
Pages from Tunneline - Mt Ousley.jpgjpeg169.25 kBJPEGThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.