Please use this identifier to cite or link to this item:
https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3404
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | ITS Pipetech | - |
dc.date.accessioned | 2018-01-31T04:01:00Z | - |
dc.date.available | 2018-01-31T04:01:00Z | - |
dc.date.copyright | 2017 | en_US |
dc.date.issued | 2017 | - |
dc.identifier.uri | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3404 | - |
dc.description | Project Sheet | en_US |
dc.description.abstract | Combining traditional tunnel ling technology with modern day rehabilitation techniques enabled ITS Pipetech to submit and subsequently provide a solution to RMS [Roads & Maritime Services] to extend the life of an existing set of culverts that crossed the M 1/Princes Highway outside The University of Wollongong. The prime objective of the work was to provide structural integrity and equalise the bores of a triple cell culvert that passed beneath one of the busiest arterial routes in Australia and to achieve a design life of 100 years. The secondary consideration was to devise a methodology and a seq ue nee of works that caused the least disruption to the motorway that carries over 18,000 vehicle movements a day just 2 m above the top of the culverts. | en_US |
dc.publisher | ITS Pipetech | en_US |
dc.subject | Road Infrastructure | en_US |
dc.title | Rehabilitation and Partial Up-size of Existing Concrete culverts Under the M1 Motorway, Wollongong, NSW | en_US |
dc.type | Project Sheet | en_US |
Appears in Collections: | Company Project Sheets and Corporate Brochures |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Tunneline - Mt Ousley.pdf | 668.77 kB | Adobe PDF | ![]() View/Open | |
Pages from Tunneline - Mt Ousley.jpg | jpeg | 169.25 kB | JPEG | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.