Please use this identifier to cite or link to this item:
https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/7008
Type: | Article |
Title: | Isolation of a Critical Asset in the Water Supply Network |
Authors: | Rieck, Craig |
Tags: | Water Management |
Issue Date: | 2021 |
Copyright year: | 2021 |
Publisher: | Institute of Public Works Engineering Australasia Queensland |
Abstract: | How do you take the largest water reservoir in your network offline for a period of three months for re-lining? The short answer is you bypass it. The reality (or the long answer) is that is takes 12 months of planning, trials and teamwork to ensure water security. |
URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/7008 |
Appears in Collections: | Infrastructure (Roads, Water, and Building). |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Craig Rieck Article.pdf | 4.71 MB | Adobe PDF | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.