Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/6924
Full metadata record
DC FieldValueLanguage
dc.contributor.authorStroud, Daniel-
dc.date.accessioned2021-04-23T03:01:16Z-
dc.date.available2021-04-23T03:01:16Z-
dc.date.copyright2021en_US
dc.date.issued2021-04-
dc.identifier.urihttps://webcast2.gigtv.com.au/Mediasite/Channel/ipweaq-cq-branch-conference-2021/watch/3bdbb047b33a416384974d43176ae9d61d-
dc.identifier.urihttp://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/6924-
dc.description.abstractThe A01 Sewer Pump Station Upgrade project is intended to replace the previous pump station on the same A01 site in Gladstone, Queensland. The project has significant construction challenges including excavation and caisson construction adjacent to the existing pump station and sewage storage infrastructure, and close to nearby businesses. The new pump station includes a 9m diameter by 9m deep well, three new pumps and associated inlet and discharge main pipework, electrical supply and control infrastructure and connection to existing infrastructure. Daniel Stroud is the Superintendent for the construction project, responsible for managing the construction contractor and ensuring that the works are executed within the boundaries of the contract and that the final product is constructed in accordance with the Standards and Specifications.en_US
dc.language.isoenen_US
dc.publisherIPWEAQen_US
dc.titleA01 Sewer Pump Station Upgrade - Large Pump Station Construction in a Constrained Environment - AECOM Australiaen_US
dc.typeAudio Visual Recordingen_US
Appears in Collections:CQ21: Presentations

Files in This Item:
File Description SizeFormat  
Conference Paper Daniel Stroud.pdf1.27 MBAdobe PDFThumbnail
View/Open
pp Presentation - Daniel Stroud (optimised).pdf4.81 MBAdobe PDFThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.