Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3403
Full metadata record
DC FieldValueLanguage
dc.contributor.authorITS Pipetech-
dc.date.accessioned2018-01-31T03:52:25Z-
dc.date.available2018-01-31T03:52:25Z-
dc.date.copyright2017en_US
dc.date.issued2017-
dc.identifier.urihttp://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3403-
dc.descriptionProject Sheeten_US
dc.description.abstractITS PipeTech were engaged by Rio Tinto to renew three corrugated steel arch bridges in WA. The project involved the installation of a stand alone structural lining to the inside of an existing 3 span corrugated steel arch bridge under the main Cape Lambert rail line. Each of the existing arch spans measured 8.0m in width and 4.1m high with a depth of 17.0m. Gaps between the outer and central arches was 0.Smen_US
dc.publisherITS Pipetechen_US
dc.subjectRail Infrastructureen_US
dc.titleUpgrade of Existing Infrastructure Under Cape Lambert Rail Line, Rio Tinto, WAen_US
dc.typeProject Sheeten_US
Appears in Collections:Company Project Sheets and Corporate Brochures

Files in This Item:
File Description SizeFormat  
Pages from Tunneline - Cape Lambert.pdfjpeg734.57 kBAdobe PDFThumbnail
View/Open
Tunneline - Cape Lambert.pdf1.02 MBAdobe PDFThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.