Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3071
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHull, Allan-
dc.date.accessioned2017-10-31T23:46:02Z-
dc.date.available2017-10-31T23:46:02Z-
dc.date.copyright2016en_US
dc.date.issued2016-06-
dc.identifier.urihttp://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3071-
dc.descriptionArticleen_US
dc.description.abstractAn extensive slip occurred on Cooroy Belli Creek Road, Cooroy, during Ex Tropical Cyclone Marcia in February 2015. Following the event, Council commissioned a geotechnical investigation and considered several options for the repair work with the method of soil nailing and wire mesh considered the most appropriate.en_US
dc.publisherInstitute of Public Works Engineering Australasia Queenslanden_US
dc.subjectSoil Nailingen_US
dc.subjectWire Mesh Landslip Repairen_US
dc.titleSoil nailing and Wire Mesh Landslip Repairs: A Case Studyen_US
dc.typeArticleen_US
Appears in Collections:SEQ Articles, Industry Papers and Presentations

Files in This Item:
File Description SizeFormat  
Allan Hull Paper June 2016.pdfArticle188.37 kBAdobe PDFThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.