Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2746
Type: PowerPoint
Title: Highfields Sports Precinct Project
Authors: Busby, Lee
Doyle, Dominic
Tags: Bulk Earthworks
Issue Date: Nov-2015
Publisher: Institute of Public Works Engineering Australasia Queensland
Abstract: Background Scope • Stage 1 – Construction Activities  Site facilities  Setting out of works  Temporary erosion and sediment control  Clearing and grubbing  Remove and stockpile topsoil  Earthworks on leads  Scarify surface of bulk earthworks  Remove and place topsoil from stockpile  Boundary fencing around protected vegetation • Preconstruction Advice  Theoretical zero balance of cut to fill  Assumed clean site – minimal unsuitable material  Water available on site - Dam and bore on site • Initial Estimate  Approx. $5 M (Risk – Commercial perspective)  Revised to $2.15 M • Delivery  Stage 1 Deadline – 31 May 2015
Description: PowerPoint Presentation
URI: http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2746
Appears in Collections:SWQ Branch Conference Toowoomba 2015

Files in This Item:
File Description SizeFormat  
Lee Busby and Dominic Doyle Toowoomba 2015.pdfppt1.54 MBAdobe PDFThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.