Please use this identifier to cite or link to this item:
https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/1751
Type: | Article |
Title: | Relationship Contracting: The South Australian Experience A Case Study |
Authors: | Zuo, Jian |
Tags: | Relationship contracting |
Issue Date: | 2006 |
Copyright year: | 2006 |
Publisher: | UTSePRESS |
Citation: | Zou, J. 2006. Relationship Contracting: The South Australian Experience: A Case Study, UTS ePRESS,http://epress.lib.uts.edu.au/journals/index.php/AJCEB/article/view/2981 |
Abstract: | The construction industry has long been accused of poor performance. The confrontational attitude of its members and the resultant adversarial atmosphere has been identified as a major factor responsible for this poor performance. A cultural change is required to remove these barriers and to promote optimum project outcomes. Relationship contracting is promoted as a way to support the shift from the adversarial culture to the co-operative and collaborative culture within the industry and the project team. The Adelaide Convention Centre Extensions project was the first in South Australia to be procure und r the principles of relationship contract1ng. Usmg the case study approach, this paper reviews the form of relationship contracting used in this milestone project. The paper documents the lessons learned from this project and makes recommendations that can lead to improvements for future projects. |
Description: | 13 page journal article |
URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/1751 |
ISSN: | 2204-9029 |
Appears in Collections: | Public Works: Journal Articles and Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Zuo_Jian_Construction Economics and Building.pdf Restricted Access | 823.14 kB | Adobe PDF | ![]() View/Open Request a copy |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.