Title: Extended Stockpile Working Times: Plant Mix Foam Bitumen
Authors: Carruthers, Rex
Rhoden, Paul
Tags: Road Design and Maintenance
Issue Date: Dec-2018
Publisher: Institute of Public Works Engineering Australasia Queensland
Abstract: The Scenic Rim Regional Council in Southern Queensland needed to repair small isolated sections of failed pavement throughout their road network. The use of foam bitumen pavement was considered to provide resilience in any future flood events. Due to the isolation and the reality of repair work on functioning roads the council only requires approximately 100-150t a day. The work was also to be performed over a month when the construction resources were available for council use.
URI: http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/4694
Appears in Collections:Infrastructure (Roads, Water, and Building).

Files in This Item:
File Description SizeFormat 
Extended Stockpile Working Times Plant Mix Foam Bitumen.pdfpdf1.65 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.