Please use this identifier to cite or link to this item: https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3995

Type: PowerPoint
Title: Replacement of the Original Gateway Bridge Expansion Joint Bearings by Evan Lo
Authors: Lo, Evan
Tags: Bridge Design;Gateway Bridge Expansion
Issue Date: Oct-2018
Publisher: Institute of Public Works Engineering Australasia Queensland
Abstract: The original Gateway Bridge was completed in 1986 and is a major transport corridor across the Brisbane River. The project replaced four pot bearings at the two major movement joints of the bridge under live traffic and at 40 metres above the ground/river. This project reconciled a multitude of unique complex challenges including proactive asset management of hidden bridge bearing components, challenging site constraints, the need to challenge current engineering standards and specifications for new bridge bearings for existing bridge bearing retrofits, complex community and political environment, and working under live operating roads
URI: http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3995
Appears in Collections:2018 IPWEAQ Annual Conference, Gold Coast (Presentations)

Files in This Item:
File Description SizeFormat  
Even Lo Slide.png97.12 kBimage/pngThumbnail
View/Open
Evan Lo PPT PDF.pdf3.25 MBAdobe PDFThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.