Please use this identifier to cite or link to this item:
https://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3995
Type: | PowerPoint |
Title: | Replacement of the Original Gateway Bridge Expansion Joint Bearings by Evan Lo |
Authors: | Lo, Evan |
Tags: | Bridge Design;Gateway Bridge Expansion |
Issue Date: | Oct-2018 |
Copyright year: | 2018 |
Publisher: | Institute of Public Works Engineering Australasia Queensland |
Abstract: | The original Gateway Bridge was completed in 1986 and is a major transport corridor across the Brisbane River. The project replaced four pot bearings at the two major movement joints of the bridge under live traffic and at 40 metres above the ground/river. This project reconciled a multitude of unique complex challenges including proactive asset management of hidden bridge bearing components, challenging site constraints, the need to challenge current engineering standards and specifications for new bridge bearings for existing bridge bearing retrofits, complex community and political environment, and working under live operating roads |
URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3995 |
Appears in Collections: | 2018 IPWEAQ Annual Conference, Gold Coast (Presentations) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Even Lo Slide.png | 97.12 kB | image/png | View/Open | |
Evan Lo PPT PDF.pdf | 3.25 MB | Adobe PDF | View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.