Please use this identifier to cite or link to this item: http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2447

Type: PowerPoint
Title: Inner City Bypass - cooperation in project planning by Jim Hefferan
Authors: Hefferan, Jim
Tags: Inner City Bypass;Airport Link;Project Planning and Delivery
Issue Date: 2016
Publisher: Institute of Public Works Engineering Australasia Queensland
Abstract: The Inner City Bypass (ICB) is a major link in the road network with connections to Lutwyche Road, Airport Link Tunnel, Clem Jones Tunnel, Legacy Way tunnel and the soon-to-be-upgraded Kingsford Smith Drive. The existing ICB is operating at up to 90% capacity however will be severely over capacity by 2021, with this section of the ICB currently carrying more than 100,000 vehicles per day. In order to address this issue, Brisbane City Council is planning to widen the Inner City Bypass (ICB) between Legacy Way and the RNA tunnel to increase capacity and allow for future growth along the corridor. This paper will discuss the strategies used to ensure the planning process addressed priority outcomes for key stakeholders.
Description: PowerPoint Presentation
URI: http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2447
Appears in Collections:2016 IPWEAQ Annual Conference Proceedings (POWERPOINT PRESENTATIONS)

Files in This Item:
File Description SizeFormat  
03 Heffernan.pptxppt8.17 MBMicrosoft Powerpoint XMLView/Open
Pages from 03 Heffernan.jpg245.71 kBJPEGThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.